What We Do

Services

Everything we build, repair, and maintain, laid out so you know what you're actually paying for.

Home › Services

Everything we take on

Every job below is one we do ourselves across Elk Grove village.

Deck Installation

We frame new decks with pressure-treated joists set 16 inches on center, footings poured below Illinois's 42-inch frost line. That's the part nobody sees once the boards go down, and it's the part that decides whether the deck is still level in ten years.

Custom Deck Design

We'll walk your yard and figure out where the deck actually makes sense, not just where the slider happens to be. Multi-level layouts, built-in bench seating, and spots for a grill or hot tub all change the framing underneath, so we plan that before any lumber shows up.

Deck Repair

Soft or spongy boards, a railing that moves when you lean on it, stairs that bounce, we fix all of it without necessarily tearing the whole deck apart. Sometimes the fix is a few joists and a ledger board, sometimes it's cheaper to replace the whole structure, and we'll tell you which one you're actually looking at.

Deck Staining & Sealing

We pressure wash first, let the wood dry out for a couple of days, then sand down any raised grain before staining. A semi-transparent oil stain holds up better against UV graying than most water-based products, and we'll tell you which one your wood actually calls for.

Composite Decking Installation

Composite boards like Trex or TimberTech cost more up front but skip the every-other-year sanding and restaining cycle that wood decks need. We still frame underneath with real lumber or steel joists, composite only replaces the boards and sometimes the railing, not the structure.

Deck Replacement

When the framing's shot but the footings are still good, we'll reuse what's sound and replace the rest instead of starting from a bare patch of dirt. That keeps the cost down without cutting corners on the parts that actually hold the deck up.

Deck Railing Repair & Installation

Illinois code calls for guardrails at 36 inches on most residential decks and baluster spacing that won't pass a 4-inch sphere through it. We build to that spec whether we're replacing a whole railing system or just the section that's come loose.

Multi-Level Deck Construction

Stepped decks and wraparound layouts need stair stringers and landings calculated for the actual rise and run, not eyeballed. We lay that out before cutting anything, because a stair that's off by half an inch per step is the kind of thing people trip on.

Pergola & Shade Structure Installation

A pergola or shade structure attached to an existing deck changes the load on those posts, so we check the framing before we bolt anything to it. We'll build it as part of a new deck or add it to one that's already standing.

Deck Demolition & Removal

Sometimes the right call is tearing the old deck out down to the ledger board and starting the framing over. We haul the old lumber off site, that's not left for you to deal with.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Elk Grove village, IL

Deck construction and repair covered across these communities.

Elk Grove village, IL
Chicago, IL
Aurora, IL
Joliet, IL
Naperville, IL
Elgin, IL
Schaumburg, IL
Evanston, IL
Arlington Heights, IL
Palatine, IL
Des Plaines, IL
Mount Prospect, IL
Common Questions

Things worth asking

What comes up once a project actually gets started.

Do I need a permit to build a deck in Elk Grove Village?
Most new deck construction and many deck replacements require a building permit in Elk Grove Village and surrounding municipalities, especially when the deck is attached to the house or elevated more than 30 inches. Permit applications and inspections are handled as part of the project rather than left for the homeowner to sort out.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from the first footing to the final board, weather permitting. Multi-level decks, built-in features, or composite material with hidden fasteners can add several more days to that timeline.
Can a deck be built to fit a specific budget?
Budget can be matched to a deck project by adjusting size, decking material, and railing choice rather than cutting corners on the structure underneath. Pressure-treated pine keeps costs down compared to composite or cedar, without compromising the footings or framing that need to be solid.
Is there a warranty on deck construction work?
Workmanship on new deck construction and repairs is generally covered for a period after completion, with manufacturer warranties on composite decking and hardware covering material defects separately. Specific warranty terms are included in the written quote for each project.
Who will I be dealing with during the project, a project manager or the crew directly?
The same crew that frames the deck handles the finish work, and that's who you'll be talking to on site day to day. Scheduling and quote questions get handled directly rather than through a separate office layer.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite brands like Trex and TimberTech are all used depending on budget and maintenance preference. Pine costs less upfront but needs restaining every two to three years, composite costs more but only needs occasional washing.
Can I still use my yard and house while the deck is being built?
Normal access to the house and yard continues during deck construction, with tools and materials kept staged to one area rather than spread across the whole lot. Noise from saws and nail guns is unavoidable during active construction hours, typically daytime on weekdays.
What do I need to do to prepare the site before work starts?
Moving patio furniture, grills, and potted plants away from the work area ahead of time speeds up the first day considerably. Underground sprinkler lines and buried cable should be marked or flagged if their location isn't already known, since footing holes can hit them.
What happens if you find rot or a problem once the old deck is torn out?
If rot in the rim joist, ledger board, or house framing turns up once the old deck is removed, that gets flagged immediately with photos and a cost estimate before any further work continues. Covering up a rotted structural member instead of replacing it is not an option, even if it adds a day to the schedule.
How should a new deck be maintained after it's built?
Wood decks should be resealed every two to three years and checked yearly for loose fasteners or soft boards, especially near the ledger board and stair stringers. Composite decking mainly needs an annual wash to clear pollen and mildew, with hardware and railing connections checked the same way as a wood deck.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (630) 354-0899